粉状防火保温材料的施工方法

  根据不同地区、不同季节、不同气候特点、不同空气湿度、不同基层墙体材料按“WW”无机保温隔热材料与水重量约1.5:1左右的比例,放置搅拌机搅拌3—5分钟达到适宜操作即可。初凝时间在2小时左右。
  Based on the characteristics of different areas, different seasons, different weather, different air humidity and different wall materials at the grass-roots level according to the "WW" inorganic thermal insulation materials and water weighs about 1.5: the proportion of around 1, place the blender mixing reach appropriate operation 3-5 minutes. Initial setting time at about 2 hours.
  先将基层墙体冲洗干净并保持湿润后(若混凝土等光面墙体需提前一天做常规界面砂浆甩浆处理),将搅拌好的“WW”隔热保温材料直接批抹在基层墙体上或抹平水泥砂浆上。
  First after the primary wall is rinsed clean and moist, smooth surface, such as concrete wall should be one day in advance to do regular interface mortar centrifuge processing), will be "WW" heat preservation material mixture batch wipe on the wall at the grass-roots level directly or with cement mortar.
  第一遍以均匀密实将墙体覆盖为主,厚度掌握在10㎜左右,当第一遍材料的含水量大约在50%时,可进行第二遍批抹,批抹厚度可掌握在10—20㎜之间直至达到设计要求厚度。达到粘结牢固、不空鼓、不开裂。
  The first time is given priority to with smooth dense wall covering, thickness in about 10 ㎜, when the first time the material moisture content at about 50%, the second time can be batch, batch with thickness between 10-20 ㎜ can be mastered and thickness to meet the design requirements. Strong to binding, not empty drum, no crack.
  一般隔热保温材料施工厚度在20㎜-25mm内可一次性批抹即可完成,隔热保温材料厚度在30㎜-40mm内可二次批抹即可完成,也可按外1内2复合保温。全部工序当天完成,七天后便可粘贴面砖,十天后便可做涂料饰面。施工工期比任何其它保温系统节省一半以上。省工序、省时间、省费用、工期短、效益高。
  General heat insulation heat preservation material construction within 20 ㎜ - 25 mm thickness can be a one-time batch can complete, heat insulation heat preservation material thickness within 30 ㎜ - 40 mm can second batch to complete, also can press 1 2 composite insulation. All process done in the day, seven days, you can paste the brick, ten days can do paint finishes. Construction period than any other insulation system to save more than half. Province process, save time and cost, short construction period and high efficiency.
  基层墙体达到相关标准要求,保温层厚度及构造做法应符合设计要求,各构造层之间必须粘结牢固、无脱层、无空鼓、无裂缝等现象。孔洞、线槽、线盒、管道穿墙等需后处理部位应做到:尺寸准确、边缘整齐、线角和灰线平直方正、清晰美观。
  Wall at the grass-roots level to fulfill the requirements of relevant standards, the insulation layer thickness and construction practices should comply with the design requirements, between structural layer must be bonded firmly, delaminating, empty drum, no cracks. Holes, trough, cable box, pipe wall, etc to reprocessing parts should be: size accurate, neat, the line Angle and the grey line straight founder, clear and beautiful.
  做好产品保护,对刚施工完的墙面,避免雨淋浸泡和碰撞,保持施工现场通风干燥。每次施工完毕后要及时清洗施工工具和搅拌机具,以免影响下次使用。
  Getting the product protection, to just finish construction of metope, avoid the rain soaked and collision, keep ventilated dry construction site. Every time after the construction should be timely cleaning construction tools and mixing machine, so as not to affect the next use.

<<