抗倍特板的施工流程介绍

1、基层处理
1, basic treatment
清理墙面浮砂、浮尘、异物,修补,保证墙面基本平整。
Clean the wall floating sand, dust, foreign body, repair, ensure the smooth wall.
2、墙面放线
2, the wall on the line
根据墙面排版图及现场实际情况,将抗倍特板分格线弹于墙面。
According to the wall layout diagram and site conditions, the compact panel dividing line play on the wall.
3、龙骨制作
3, keel production
龙骨间距易为350~600mm。抗倍特板分格板缝处采用25*50*3.0稆方管主龙骨,板内副龙骨采用25X25X2.0铝合金方管,纵横龙骨相交处采用“L”形铝合金连接件固定。为便于施工,预先将纵横龙骨在地面拼装,一般每一拼装单元不大于6m。
Keel spacing is easy to 350~600mm. Anti Beite plate lattice seams using 25*50*3.0 aluminum tube keel, the inner plate keel uses 25X25X2.0 aluminum alloy square tube, vertical and horizontal keel intersect at using the "L" - shaped aluminum alloy connecting piece is fixed. In order to facilitate the construction, the vertical and horizontal keel in the ground assembly, the general assembly unit is not more than 6m.
www.4546.com
4、龙骨固定
4, keel fixed
将拼装好的龙骨单元安装于墙体上,调整平整度至符合要求,用膨胀螺栓、“L”形铝合金连接件进行固定(墙面为轻体墙时采用拉铆钉),固定点间距不得大于500mm。
Keel of the assembled unit installed on the wall, adjusting the flatness to meet the requirements, with expansion bolts, "L" - shaped aluminum alloy connecting piece for fixed (wall for the light body wall by pull rivets), fixed point spacing of not more than 500mm.
5、双面胶粘贴
5, double-sided adhesive paste
由于结构胶固化时间为24小时,因而采用强力双面胶进行临时固定。将双面胶单面覆膜揭下,以25mm为一段,按150-200mm间距粘贴于纵横龙骨上。
Because the curing time of the structure is 24 hours, the adhesive is used for temporary fixation. The double-sided adhesive plastic film uncovered, 25mm as a section, according to 150-200mm spacing on the vertical and horizontal bar.
6、注结构胶
6, the structure of plastic injection
在铝合金龙骨表面其余部分注结构胶,厚度略高于双面胶,一般不少于5mm。结构胶应涂抹均匀,厚度一致。
In the aluminum alloy keel surface of the remaining part of the beam structure, the thickness of slightly higher than the double-sided adhesive, generally not less than 5mm. Structural adhesive should be applied evenly, the thickness of the same.
7、抗倍特板粘贴
7, compact panel paste
揭除双面胶另一侧覆膜,将抗倍特板按照排版图切割,轻压于龙骨上。板间缝隙宽度依据装修设计确定。少量平整度误差可利用结构胶厚度进行调整。
Removing the double-sided adhesive on the other side of the film, compact panel in accordance with the layout drawing cutting, light pressure on the keel. According to the gap width between the plate decoration design. A small amount of flatness error can be used to adjust the thickness of structural adhesive.
8、板缝注胶
Note 8, rubber slab
沿板缝两侧贴防污面纹纸,用胶枪在板缝处打中性密封胶,打胶应嵌填密实,光滑平顺。
Along the seams on both sides with antifouling wove paper, a neutral sealant with the glue gun in the seams, glue should be filled dense, smooth.
9、清理
9, clean up
清除板缝处面纹纸,清洗板面。
Clear the slab joints of wove paper, surface cleaning.
10、验收
10, acceptance
按照国家标准及相关设计要求进行验收。
In accordance with national standards and related design requirements for acceptance.